The device is an Ultraviolet-only flame detector designed
to detect fires and provide alarm outputs directly from the
detector while maintaining false alarm immunity. It
detects in the ultraviolet (UV) spectral range for
optimized speed of response.
It is fast and capable to detecting the ultraviolet (UV) rays
emitted by a burning substance and is used in high hazard
applications such as petrochemical plants, munitions
factories and other areas where flammable or explosive
liquids or solids are handled or stored.
The flame sensor adopts an ultraviolet photosensitive
tube, with qualities of highly sensitive, reliable,
dust-resistant, corrosion proof and moisture-resistant,
therefore is not sensitive in sunlight, dust, oil, tolerance of
fume, and humidity. Set in a standard calibration to detect
a flames at a distance of 25 meters, which flame created
by 2Kg ethanol in a Container of Base 33cmX33cm,
Height 5cm.
Specifications
Operating Voltage Range: 12 to 28 VDC Volts
Standby Current: â?¤10 mA @ 24 VDC
Alarm Current â?¤40 mA @ 24 VDC
Spectrum: 180~290nm
Detection Angle: 120 degree
Detection Sensitivity: Grade I, 25m@flame (Container 33cmX33cm,Height 5cm with 2Kg ethanol )
Relay Contact Load: 1A@DC24V
Normal Status: LED blinking in 5 seconds interval
Alarm Status: LED lit steady
Protection rating: IP 21
Operating Humidity Range: 10% to 93% Relative Humidity, Non-condensing
Operating Temperature Range: -20°C to 55°C
Height: 45 mm installed in Base
Diameter: 103 mm
Weight: 153g
The device is an Ultraviolet-only flame detector designed to detect fires and provide alarm outputs directly from the detector while maintaining false alarm immunity. It detects in the ultraviolet (UV) spectral range for optimized speed of response.
It is fast and capable to detecting the ultraviolet (UV) rays emitted by a burning substance and is used in high hazard applications such as petrochemical plants, munitions factories and other areas where flammable or explosive liquids or solids are handled or stored.
The flame sensor adopts an ultraviolet photosensitive tube, with qualities of highly sensitive, reliable, dust-resistant, corrosion proof and moisture-resistant, therefore is not sensitive in sunlight, dust, oil, tolerance of fume, and humidity. Set in a standard calibration to detect a flames at a distance of 25 meters, which flame created by 2Kg ethanol in a Container of Base 33cmX33cm, Height 5cm.
The Incinerated scrap or E46, is the by-product derived from the reprocessing of incinerated domestic waste.
After the combustion process, the furnace output (IBA Incinerator bottom ash) is firstly washed, magnetically separated and screened to separate any no ferrous material.
At a visual inspection, the material is fragmentized, with iron and steel parts, resulting partly cut or in shredded form.
The stock appears heterogeneous and contains all kind of cut or dismantled steel parts such as sheets, bars, frames, wires, bolts and other iron/steel household residues.
The incinerated scrap is eventually oxidized, due to the thermal and cooling treatments, that the material has been submitted to. The burnt scrap also contains minor slag parts, ash and iron oxide, due to the recovery process.
Such components are inherent and adhere to the scrap surface. The total impurities, can be sorted, but not fully removed.
The consignment does not contain any type of arms, ammunition, mines, shells, cartridges, radioactive contaminated, or any other explosive material in any form either used or otherwise.
The collected stock, is stored in open air, on cemented flooring. It can be loaded loose in 20â?? heavy duty container.
Please feel free to contact us for further details.
EN590 10ppm & Jet Fuel A1 available .Tank to Tank procedure :
TRANSACTION PROCEDURES FOR FOB â??TTTâ??
(TANK-TO-TANK)
1. Buyer issues ICPO together with tank storage agreement (TSA) for
seller approval.
2. Seller issues Commercial Invoice (CI), ICC WARNING LETTER for the
available product quantity in the
storage tank in the terminal port.
3. Buyer signs and then returns the commercial invoice with NCNDA/IMFPA
signed by all buyer Groups
with commission structures.
4. Seller Issue (3 DAY unconditional Dip Test Authorization (DTA) to be
endorsed by Sellerâ??s Company,
Buyerâ??s Company and Buyerâ??s chosen Logistic Company. Upon confirmation
of the signed unconditional
Dip Test Authorization (DTA) by both parties, Seller programs the
injection and then issues buyer the
following documents.
A.FRESH SGS REPORT INSPECTED IN LOADING TERMINAL PORT.
B.TANK STORAGE RECEIPT (TSR) WITH GPS COORDINATES).
C.AUTHORIZATION TO VERIFY (ATV).
D.INJECTION REPORT SHORE TANK.
E.CERTIFICATE OF ORIGIN.
F.AUTHORIZATION TO SELL & COLLECT (ATSC).
5. Buyer upon physical verification of the product and PPOP
confirmation, contracts SGS to conduct the
Dip test in Seller Storage Tank on Buyerâ??s expense.
6. Upon successful Dip Test, Buyer presents the tank storage receipt
(TSR).
7. Seller commences injection immediately into buyer tank and â??issues
buyer Title of Ownership
Certificate to be followed by all export Documentation.
8. Buyer makes payment by MT103 or TT wire transfer for the total
product and lifts the product, andseller pays all
intermediary involved in the transaction
1. Berry copper wire scrap conforming to ISRI standards/specs.
2. Minimum order quantity: 200 Metric tons. The seller can offer 1000MT - 2000MT per month / per shipment on a long term basis ( for quantities greater than the above mentioned, please write to us in detail )
3. Origin of scrap wire ( either S.A / Europe / Russia ) seller's option.
4. SOP: Letter of Intent with Bank Confirmation letter from the Buyer (trading companies). If the buyer-importer is end-user/consumer, BCL is not required but due to manufacturing licence/end products' details and other information as required before the execution of a contract.
5. Price $5500pmt CFR one safe port
6. Delivery/shipment - shall be provided after the receipt of LoI with BCL and due diligence.
7. Payment terms by Irrevocable, confirmed Letter of credit from first-class/internationally recognized bank
SizeMagikTM-LP4 - LOW PICK UP ONE-SHOT PRODUCT
DESCRIPTION An unique copolymer sizing agent for cotton compact yarn. Special product for air jet loom. Heavy fabric constructions are easier to weave at low-size add-ons using SizeMagik-LP4. The low add-on also permits greater protection on high-speed looms expensive reeds and sensitive mechanical parts life.
SPECIFICATIONS
1. Appearance: Off white Granules
2. Solubility: Soluble at 800C
3. Viscosity of 4% solution: 10 to 30 cPs
(Brookfield viscometer LVDV II+ pro -Spl.2 , rpm:100 @ 80oc)
4. Ash content (w/w) : Max 3%
5. Bulk density (gm/ml) : 0.65 to 0.85
COOKING METHOD
1. Fill the required quantity of water in the cooker.
2. Gradually sprinkle SizeMagikTM-LP4.
3. Add the required quantity of softener.
4. Close the pressure cooker lid.
5. Open the steam value and cook to @ 120�¯�¿�½?�?�ºC or 35psi.
6. Retain in the cooker for 15 to 20 minutes.
7. Then transfer the size mix to storage.
ECONIMICAL ADVANTAGES
Yarn abrasion resistance is an important factor affecting weave ability. The friction between the warp to warp and warp to the weft is important in determining the weaving quality. Another important abrasion point in the loom is mechanical parts (Reed, Dropper pin, Heald wire, Weft picking element). Compare with other conventional size mixes and one-shot size products SizeMagik-LP4 gives better abrasion resistance strength.
DE-SIZING
Easily de-sizable product with hot alkali treatment.
STORAGE
Keep away from direct sunlight and store in a cool, dry, and well-ventilated place.
STABILITY
Stable for one year from the date of manufacture.
PACKING
Available in 50Kg net weight PP bags with moisture-proof liner inside.
EN590 10ppm ULSD Diesel available. Vessel to Tank transaction in Jurong port Singapore.No upfront payment.
VTT price $460/MT including $10 commission to buyer's side.
1. Buyer send ICPO with TSA
2. Seller issue CI
3. Seller sends to Buyer the following documents for Buyer's confirmation.
A. Q88
B. Bill of Lading
C. Estimated Time of Arrival E.TA.
D. Q&Q Analysis Report by IQS at loading Port.
E. Ullage/load line report
F. Cargo Manifest.
4. Buyer receives documents and sends Tank Storage Receipt for injection of
product to buyers tanks.
5. Seller injects products to buyers tanks and Buyer order SGS or Equivalent
inspection team for Q&Q inspection.
6. Upon the successful completion of Dip-test inspection, Buyer makes payment
by MT103 wire transfer for the total goods value, Seller transfers Title of ownership Certificate to buyer's name as the legitimate owner of the goods.
7. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
FOB TRANSACTION PROCEDURES
1. Buyer Issues ICPO, Company Registration Certificate and Tank Storage Agreement(TSA)for
seller approval.
2. Seller issues COMMERCIAL INVOICE (CI), STATEMENT OF PRODUCT AVAILABILITY, and
COMMITMENT to SUPPLY the available quantity in the Storage Tank and then program the
injection. THIS USUALLY DEPENDS ON THE LOCATION.
3. Buyer countersigns Commercial Invoice (CI) & Warning Letter with NCNDA/IMFPA signed
by all Buyer groups with commission structures.
4. Send the below proof of product (Documents) via email If Necessary.
Fresh SGS (Q&Q report) less than 48 hours.
Tank storage receipt. (TSR).
Authorization to verify (ATV).
Injection report Shore Tank (IR).
Certificate of Origin.
Product passport.
Authorization to Sell and collect (ATSC).
5. After the successful verification of the product existence, buyer order SGS to conduct their
Dip-Test in the seller tank on buyer expense and then issues buyer.
â?¢ Unconditional Dip Test Authorization (UDTA).
â?¢ ATSC authorization to Sell/Collect.
â?¢ Title of Ownership Certificate, (on seller expense).
6. Upon the successful dip test, Buyer presents their tank storage receipt (TSR), Seller issues
all export Documentation.
7. Buyer makes payment by MT103 or TT wire transfer for the total product and lifts the
product and seller pays all Intermediary involved on the transaction.
FOB: PROCEDURE TANK TO TANK (TTT)-2
NON-NEGOTIABLE
F.O.B. FREE ON-BOARD TANK TO TANK PROCEDURE (DIP AND PAY)
1. Buyer issues ICPO and Company Registration Certificate or any I.D. With TSA for
seller's verification.
2. Seller issue Draft Commercial Invoice, Buyer signs and returns to Seller with his Tank
Storage Agreement.
3. Seller lease and pays the buyer's tank for 3 days for the tank to tank Injection Process,
Buyer do pay his Tank Farm Company for 2 days after the Tank Farm Company has received
the payment from Seller Company. (Note: If buyer has existing TSR and or buyer can provide
TSR after the sign of commercial invoice on its own, there will be no need for joint payment
for the buyer tanks.
4. Seller provides buyer with FULL POP Documents:
Fresh SGS Report less than 48 hours
Dip Test Authorization-Unconditional
Injection Report
Storage Receipt with GPS Coordinates
Tank Farm Bar-code Information
Letter of Commitment to Supply.
Registration Certificate & Export License Copy
Authority to Sell & Collect (ATSC)
Endorsed Injection Schedule by the buyer & buyer Tank Farm
ATV - For Physical Verification
Irrevocable Commitment to Supply for Spot and 12 months Contract
Injection Schedule signed by buyer & buyer's tank farm
5. Buyer conducts Dip-Test in seller's tank; via SGS on buyer's cost seller inject the fuel
into buyer's tank and Buyer makes payment based on Q&Q by MT103 wire transfer / TT
according to the final Commercial Invoice.
6. Seller transfers the title of ownership as per Buyer's instruction. Buyer lifts the
product.
7. Seller pays all intermediaries involved in the transaction and subsequently monthly
contract shipment continues as per terms and conditions of the sales and purchase
agreement contract between buyer and seller