Please click here to check who's online and chat with them.

Find Verified Electrical Household Other Goods Components Suppliers, Manufacturers and Wholesalers

Jan-14-21
 Inquire Now  
IMK 70.5 cable crane
The crane is designed to handle and lift loads of up to 70,500 kgf, reaching a 66-meter height and 36-meter radius. Equipped with a stand referred to as super-structure, featuring two-stage telescopic stickout outriggers, promoting the crane stability. The combination of boom slewing, linkage and telescoping motions make it possible to position the crane at the right position to lift the load using the cable winch. Depending on the load to be lifted, it is possible to work with 1 to 12 slings. The load handling is always performed through winch, turning and boom set lifting.

ASSEMBLY: On any national or imported heavy duty truck, with a minimum PBT of 46,000 Kgf, 6,000 mm wheelbase and installation of a second directional shaft, allowing for the perfect eight distribution, according to the Brazilian Traffic Legislation.

Categorias: Cable cranes, Cranes Tags: a cabo, guindastes
Sep-25-26

5 X Caterpillar 3516B - 10 Mw

$1.50M - $1.75M / Set (FOB)
MOQ: 1  Sets
Supplier From Belo horizonte, Mg, Brazil
 Inquire Now  
5 (five) Caterpillar 3516B Diesel Generator Sets - 10 MW total

KEY HIGHLIGHTS
â?¢ Quantity: 5 units (4 �? 2013 | 1 �? 2015)
â?¢ Condition: low hours (commissioning only, never run commercially)
â?¢ Output: 2,500 kVA / 2,000 kW (Standby) | 2,281 kVA / 1,825 kW (Prime)
â?¢ Voltage: 13,800 V | 60 Hz | 3-phase | 0.8 PF
â?¢ Generator: CAT SR5, Brushless, PMG excitation, IP23
â?¢ Control: EMCP 4.2 digital module
â?¢ Includes: Hospital-grade acoustic treatment (silencers + attenuators)

All five units are located in Brazil and available for immediate inspection.
Oct-18-16

Electrical Ducts, Strut Chanels, Fixings

MOQ: Not Specified
Sample Available
Supplier From Campo Grande, Mato Grosso Do Sul, Brazil
 Inquire Now  
The manufacturer of electromechanical products focused in the national and international market with the purpose of attending its clients in a rapid, efficient and effective manner all in an atmosphere of Total Quality, a decisive characteristic in an ever so demanding consumer reality. This was the start off point of a policy for constant improvement of the process to optimize commercial operations with our clients and suppliers.

In 2014 the company obtained ISO 9001:2008 which certifies quality within international parameter of its internal practice.

Professionals with more than 10 years’ experience, adequate inventory, operational logistics formulated to optimize commercial operations, and a well-trained sales team with know-how to solve daily technical queries.

In case of more complex necessities regarding our products or services, we offer competent technical support thus assuring reliability and security to our clients in a competitive, rapid, demanding, and ever changing market.

Our Mission:

Attend and exceed our customers’ and partners’ expectations furnishing products and services of high quality, reliability, and punctuality.

Vision:

Consolidate and fortify our trademark, nationally and internationally, as a first alternative in the “Electromechanical Products” market thru credible, ethical, and transparent commercial channels assuring loyalty and excellency in our services.


Catalog with complete product line is available to quotations
Sep-30-26

220 Mw Installed Wind Power Plant â?? Brazil, 01

$268 - $270 / Feet (FOB)
MOQ: Not Specified
Supplier From Rio de Janeiro, Brazil
 Inquire Now  
A complex located in Northeast Brazil,
developed in three phases with installed capacities of 80 MW, 50 MW, and 90 MW, totaling approximately 220 MW.
Phase 1 â?? Operations began in 2016.
Phase 2 â?? Operations began in 2017.
Phase 3 â?? Operations to begin in 2025.
Phase 1:
Comprising four Wind Turbine Central Generators ( CGEs ).
Operating License valid until 2049. GE Turbines â?? Capacity Factor (CF) 35%.

PPA = ACR ( Regulated Market).
PPA Term : Until December 2035.
PPA Tariff : R$ 220.00.
Energy traded in the A-3 auction .

Long-term Debt :
2 contracts : R$213 million + R$75 million (BNDES/BNB).

Phase 2:
Comprising two Wind Turbine Central Generators . Operating License valid until 2050.
GE Turbines â?? Capacity Factor (CF) 36%.

PPA = ACR ( Regulated Market). PPA term : September 2037. PPA tariff : R$ 240.00.
Energy traded in the LER/2014 auction .

Long-term debt :
2 contracts : R$ 151 million + R$ 53 million (BNDES/BNB) Operating License
Phase 3
until 2057
Vestas turbines - CF 37%

PPA = ACR + ACL
PPA term = December 2040
PPA rate: R$ 201.00

Long-term debt :
1 contract : R$ 289 million (BNDES/BNB)

Sale of Complex Operations : US$ 268 million
Oct-03-06
Supplier From asuncion, Paraguay
 Inquire Now
187 Electrical Household Other Goods Components Suppliers
Short on time? Let Electrical Household Other Goods Components sellers contact you.
Nov-14-05
Supplier From Poa, Sao Paulo, Brazil
 Inquire Now
May-27-09
Supplier From Quito, Ecuador, Ecuador
 Inquire Now
Dec-02-09
Supplier From Poa, Spo Paulo, Brazil
 Inquire Now
Mar-08-08
Supplier From Queqing, Argentina
 Inquire Now
Apr-26-18
Supplier From Pinhais, Brazil
 Inquire Now
Apr-26-19
Supplier From Rosario, Argentina
 Inquire Now
Sep-29-09
Supplier From Buenos Aires, Buenos Aires, Argentina
 Inquire Now
Nov-19-10
Supplier From Shijiazhuang, Hebei, Chile
 Inquire Now
Sep-13-06
Supplier From Campinas, Sao Paulo, Brazil
 Inquire Now
Dec-14-22
Supplier From Brazil
 Inquire Now
Mar-18-19
Supplier From Asuncion, Capital, Paraguay
 Inquire Now
Jan-13-24
Oct-24-01
Supplier From Maracaibo, Edo Zulia, Venezuela
 Inquire Now
Jun-28-01
Supplier From Medellin, Antioquia, Colombia
 Inquire Now
Jun-17-08
Supplier From Barranquilla, Colombia
 Inquire Now
187 Electrical Household Other Goods Components Suppliers
Short on time? Let Electrical Household Other Goods Components sellers contact you.
See what buyers and suppliers are discussing in Electrical Household Other Goods Components import export community