Please click here to check who's online and chat with them.

Find Verified Turbines Suppliers, Manufacturers and Wholesalers

Oct-07-26

3 X Sgt-100 - 14,31 Mw Gas Turbine, A

$11.50M - $12.00M / Set (FOB)
MOQ: Not Specified
Supplier From Belo horizonte, Mg, Brazil
 Inquire Now  
Turbine:
Manufacturer: Siemens
Model: SGT-100
Date of Manufacture: 1995
Fuel Type: Natural Gas
ISO Rated Zero Loss Power: 4,772 kW

Included BOP and a list of spare parts, including 3 used core engines to be refurbished
Sep-30-26

220 Mw Installed Wind Power Plant â?? Brazil, 01

$268 - $270 / Feet (FOB)
MOQ: Not Specified
Supplier From Rio de Janeiro, Brazil
 Inquire Now  
A complex located in Northeast Brazil,
developed in three phases with installed capacities of 80 MW, 50 MW, and 90 MW, totaling approximately 220 MW.
Phase 1 â?? Operations began in 2016.
Phase 2 â?? Operations began in 2017.
Phase 3 â?? Operations to begin in 2025.
Phase 1:
Comprising four Wind Turbine Central Generators ( CGEs ).
Operating License valid until 2049. GE Turbines â?? Capacity Factor (CF) 35%.

PPA = ACR ( Regulated Market).
PPA Term : Until December 2035.
PPA Tariff : R$ 220.00.
Energy traded in the A-3 auction .

Long-term Debt :
2 contracts : R$213 million + R$75 million (BNDES/BNB).

Phase 2:
Comprising two Wind Turbine Central Generators . Operating License valid until 2050.
GE Turbines â?? Capacity Factor (CF) 36%.

PPA = ACR ( Regulated Market). PPA term : September 2037. PPA tariff : R$ 240.00.
Energy traded in the LER/2014 auction .

Long-term debt :
2 contracts : R$ 151 million + R$ 53 million (BNDES/BNB) Operating License
Phase 3
until 2057
Vestas turbines - CF 37%

PPA = ACR + ACL
PPA term = December 2040
PPA rate: R$ 201.00

Long-term debt :
1 contract : R$ 289 million (BNDES/BNB)

Sale of Complex Operations : US$ 268 million
May-22-26
Supplier From Belo horizonte, Mg, Brazil
 Inquire Now
Aug-04-22
Supplier From Sertaozinho, Sao Paulo, Brazil
 Inquire Now  
Manufacturer: Siemens turbines
Condition: used
- guaranteed power: 53.570 KW
- vapour pressure alive: 94,00 bar
- live steam temperature: 518,00
- live steam flow: 189.02 t/h
- inlet thermal load flow: 647,752,638 kJ/h
- socket pressure a3: 17,581 bar
- socket flow rate a3: 13,490 t/h
- thermal load flow a3: 40,812,646 kJ/h
- socket pressure a2: 7,292 bar(a)
- outlet flow a2: 18,50 t/h
- socket pressure a1: 1,181 bar(a)
- tap flow a1: 14,54 t/h
- heat load flow a1: 37,296,554 kJ/h
- exhaust pressure: 0,107 bar(a)
- turbine rotation: 6,415.4 rpm
- service factor: 1,1 (over Pe)
- input rotation: 6,415.4 rpm
- output rotation: 1800 rpm
- change effective: 284.2kN.m 1800rpm
Dec-23-21
Supplier From Maringa, Parana, Brazil
 Inquire Now
8 Turbines Suppliers
Short on time? Let Turbines sellers contact you.
Aug-02-22
Supplier From Sertaozinho, Sao Paulo, Brazil
 Inquire Now
Oct-14-24
Supplier From Sao Paulo, Sao Paulo, Brazil
 Inquire Now
May-14-23
Supplier From Brazil
 Inquire Now
See what buyers and suppliers are discussing in Turbines import export community