Please click here to check who's online and chat with them.

Casing Fill Up And Circulation Tool (Fac)

Supplier From China
Mar-07-22

Fill and Circulate Tool (hereafter referred to as FAC Tool) is a surface tool used during the casing running operation. The FAC Tool is designed to both fill the casing with drilling fluid while running it in the hole and to enable quick circulation of the casing string at any time without installation of a casing swage. The FAC Tool has
features with easy â??to- use , safe and reliable , no leakage and so on, which lightens labor intensity of workers greatly and improves operation environment of well.



The FAC Tool is composed of ten parts (shown in figure) , whose main function of components are below:



1. Drill Pipe Connector: The FAC Tool built for top drive rigs connects to the drill pipe threads of the rigâ??s top drive unit via the Drill Pipe Connector. The threads of the Drill Pipe Connector are standard 4 1/2 IF, but crossovers are available for other drill pipe threads.



2. Extension: For applications where long elevator links are used, Extensions are placed between the Drill Pipe Connector and the Mandrel. On the Extension are two Pad Eyes that make it easy to manipulate the Tool around the Rig during rig up or rig down. Also, while the Tool is in use, a Safety Cable attaches to one of the Pad Eyes in the event the Tool should accidentally come loose from the top drive. In place of the Extensions, a Drill Pipe Pup can be used between the top drive connection and the Drill Pipe Connector instead of extension.



3. Mandrel: The Mandrel houses the specially designed Seal Assembly that is used to seal off the casing string. The Seal Assembly has three parts: the Seal Retainer, the Sealing Element, and the Gauge Ring.



4. Seal Retainer: Aluminum part that keeps (retains) the Sealing Element from being extruded upward while circulating.



5. Sealing Element: Elastomeric Seal that seals off the casing for circulation. It is hollow so circulation pressure can energize the seal it creates against the casing bore.



6. Gauge Ring: Tapered Aluminum piece that guides the Seal Assembly into the pipe and has holes to allow energizing pressure into the Sealing Element.



7. Retainer Sub: The Seal Assembly is held in place with the flexible hose.



8. Flexible Hose: The Retainer Sub is also used to connect a high pressure Flexible Hose. This Hose prevents any hard stack out between the FAC Tool and the casing and compensates for misalignment and casing movement during make up.



9. Mud Saver Valve: Below the Flexible Hose is the heart of the FAC Tool, the Mud Saver Valve. It is essentially a two-way check valve. This Valve opens with pressure when the mud pump is turned on and closes when the mud pump is turned off. It also permits flow in the upward direction for releasing pressure.

Price and Minimum Quantity

Price: $5000 - $20000
MOQ: Not Specified

Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Casing Fill Up And Circulation Tool (Fac)

GOLD Member
Mar-04-25
Supplier From Busan, South Korea (Republic Of Korea)
 
The SD1000 Full Hydraulic Core Drilling Rig is a robust piece of equipment designed for various drilling applications Lets dive into the details
Application Range The SD1000 crawler drill is primarily used for both diamond bit drilling and carbide bit drilling Its commonly employed in geological exploration mineral prospecting and core sampling
Specifications
Drilling Diameter 56 mm 71 mm 89 mm 114 mm 2 in 3 in 4 in 4 in
Drilling Depth 200 m 400 m 600 m 1000 m 65602 131204 196806 328010
Overall Length Working 5760 mm 227 in
Overall Width Working 2400 mm 94 in
Overall Height Working 9000 mm 354 in
Hole Range 65 89mm
Engine Power 156ps 115kw 2200rpm
Machine Weight 12400 kg 273373 lb
Motor Power 132 kW 17947 hp
Mar-09-21
 
Fill and Circulate Tool (hereafter referred to as FAC Tool) is a surface tool used during the casing running operation. The FAC Tool is designed to both fill the casing with drilling fluid while running it in the hole and to enable quick circulation of the casing string at any time without installation of a casing swage. The FAC Tool has
features with easy â??to- use , safe and reliable , no leakage and so on, which lightens labor intensity of workers greatly and improves operation environment of well.



The FAC Tool is composed of ten parts (shown in figure) , whose main function of components are below:



1. Drill Pipe Connector: The FAC Tool built for top drive rigs connects to the drill pipe threads of the rigâ??s top drive unit via the Drill Pipe Connector. The threads of the Drill Pipe Connector are standard 4 1/2 IF, but crossovers are available for other drill pipe threads.



2. Extension: For applications where long elevator links are used, Extensions are placed between the Drill Pipe Connector and the Mandrel. On the Extension are two Pad Eyes that make it easy to manipulate the Tool around the Rig during rig up or rig down. Also, while the Tool is in use, a Safety Cable attaches to one of the Pad Eyes in the event the Tool should accidentally come loose from the top drive. In place of the Extensions, a Drill Pipe Pup can be used between the top drive connection and the Drill Pipe Connector instead of extension.



3. Mandrel: The Mandrel houses the specially designed Seal Assembly that is used to seal off the casing string. The Seal Assembly has three parts: the Seal Retainer, the Sealing Element, and the Gauge Ring.



4. Seal Retainer: Aluminum part that keeps (retains) the Sealing Element from being extruded upward while circulating.



5. Sealing Element: Elastomeric Seal that seals off the casing for circulation. It is hollow so circulation pressure can energize the seal it creates against the casing bore.



6. Gauge Ring: Tapered Aluminum piece that guides the Seal Assembly into the pipe and has holes to allow energizing pressure into the Sealing Element.



7. Retainer Sub: The Seal Assembly is held in place with the flexible hose.



8. Flexible Hose: The Retainer Sub is also used to connect a high pressure Flexible Hose. This Hose prevents any hard â??stack outâ?? between the FAC Tool and the casing and compensates for misalignment and casing movement during make up.



9. Mud Saver Valve: Below the Flexible Hose is the heart of the FAC Tool, the Mud Saver Valve. It is essentially a two-way check valve. This Valve opens with pressure when the mud pump is turned on and closes when the mud pump is turned off. It also permits flow in the upward direction for releasing pressure.
GOLD Member
Feb-25-25
Supplier From Busan, South Korea (Republic Of Korea)
 
CASE MW36 Wheel Loader - Typical Specifications
Operating Weight: Approximately 3,200 to 3,600 kg (about 7,000 to 8,000 lbs)
Bucket Capacity: Generally around 0.65 to 0.9 cubic meters
Dimensions:
Overall Length: Approximately 4.0 m (varies with configuration)
Width: Roughly 2.5 m
Height: Around 3.0 m
Lift Height: Typically in the range of 2.5 to 3.0 m
Transmission: Options may include hydrostatic or mechanical drive, depending on the model configuration
Additional Features:
Ergonomic operator station
Versatile hydraulic system for various attachments
GOLD Member
Feb-26-25
Supplier From Busan, South Korea (Republic Of Korea)
 
The CAT988 with the 3408 engine is a powerful machine designed for heavy-duty applications, including container handling. Here are some key specifications:
Engine: CAT 3408 DITA (Direct Injection Turbocharged Aftercooled)
The CAT 3408 engine is a V8 engine, meaning it has 8 cylinders arranged in a V configuration.
Net Power: 538 hp (SAE J1349:2011)
Engine Power: 580 hp (ISO 14396:2002)
Gross Power: 588 hp (SAE J1995:2014)
Maximum Capacity: 50,000 pounds (as indicated on the boom arm in the image you provided)
Fuel Efficiency: Features like Economy Mode help save on fuel while maintaining productivity
Durability: Built with advanced filtration systems for extended performance and reliability
Productivity: Superior digging, higher bucket fill factors, and reduced dig times
GOLD Member
Jun-15-22
Supplier From Hangzhou, Zhejiang, China
GOLD Member
VERIFIED
Apr-21-25
Supplier From Pinneberg, Schlwesig Holstein, Germany
GOLD Member
Aug-06-22
Buyer From Ahmedabad, Gujarat, India
GOLD Member
Dec-02-24
Supplier From Wuxi, Jiangsu, China
GOLD Member
Sep-27-24
Supplier From Ankara, Turkey

Verification Status