Supplier From
Jeddah,
Makkah,
Saudi Arabia
Supplier From
Jeddah,
Makkah,
Saudi Arabia
We offer second-quality rails R50/R65 for manufacturing and construction needs globally. Rails can be delivered to the destination port under a longer contract and monthly shipments based on your demand.
Second-quality rails are used in the industry instead of used rails or scrap rails R50/R65. Second-quality railways from Baghlaf Steel are new rails. The quality of the steel in the second-quality rails is better than the quality of scrap rails because these second grade rails are not used.
Manufactured in accordance with international railway standards (GOST 8165-75 / equivalent international standards)
Standard T-Section Railway Rails
Nominal weight:
R50 - 51.67 kg/m
R65 - as per standard specification
- Suitable for railway track construction and infrastructure projects
- Supplied free from defects, cracks, harmful surface imperfections, or structural irregularities
- Delivered with Mill Test Certificate (MTC) confirming chemical and mechanical properties
- HS Code: 7302 - Railway or tramway track construction material of iron or steel
- (R50 / R65) Chemical composition shall be according to GOST 8165-75 or equivalent international standard
Chemical Composition:
R65 GOST 8165.75 WEIGHT 64.72 KG /METER
C = 0.54 % _ 0.82%
SI = 0.18 _ 0.40%
MN = 0.60 _ 1.05%
S = 0.04% _ MAX
P = 0.035% AS - 0.01 MIX OF MASS SHARE
R50 GOST 7173.75 WEIGHT 51.67 KG /METER
C = 0.54 % _ 0.82%
SI = 0.18 _ 0.40%
MN = 0.60 _ 1.05%
S = 0.04% _ MAX
P = 0.035% AS - 0.01 MIX OF MASS SHARE
The Deal Work Steps:
- LOI: The buyer sends a Letter of Intent through the agent specifying the iron quantity, type, payment method, and delivery port.
- FCO: The supplier replies with a signed Full Corporate Offer confirming availability, specifications, and price.
- Proforma Invoice: If the buyer agrees, the supplier issues a signed and certified Proforma Invoice with quantity, price, delivery details, shipments, and payment terms.
- Letter of Credit: The buyer opens a confirmed LC via SWIFT MT700 covering the full invoice amount.
- Execution: After the LC is approved, inspection and shipment start within a few days.
ORIGIN: SAUDI ARABIA
MINIMUM ORDER QUANTITY (MOQ): 700,000 MT
MAXIMUM MONTHLY SHIPMENT: 500,000 MT
DELIVERY TERMS: CIF (INCOTERMS 2020)
HS CODE: 730210000000
Accepted Payments:
- Confirmed MT700 At sight letter of bank credit for the full value of the Proforma Invoice issued by our Company.
- The revolving L/C MT700 bank credit with the bank's guarantee and its responsibility for the entire value of the Proforma Invoice.
- Standby Letters of Credit (SBLC)