Please click here to check who's online and chat with them.

File a Complaint

Your are registering a complaint against:


GOLD Member
VERIFIED
Mar-25-26
Products Description
The coconut coir fiber making machine is mainly extract fiber from coconut husk, oil palm, bamboo etc. There is currently a large market for processed coconut husk and fiber is used in mattresses. Coconut peat is used as fertilizer.
The coconut coir fiber making machine is divided into two types.Double drum and single drum. The double drum is used to process relatively hard materials, such as coconut husk etc. The single-drum can process oil-pressed palm fruit, banana leaves, bamboo, etc.

Working Principle
1. The material is conveyed to the defibering machine through the scraper conveyor.
2. Through the rapid rotation of the cutter head in the equipment, the coconut husk is separated into coconut fiber and coconut peat.
3. The material is kneaded into fiber by rotating and stirring the equipment, and then discharged through the discharge port. Coconut peat flows out under the screen of the machine.
4. The shredded coconut fiber is directly blowing into the screen to further separate the fiber and peat.
5. The output fiber enters the baler and compresses into bales. Coconut peat is further washed and dehydrated for making briquette or directly sell to market.s.

Whole Production Line
1. coconut coir machine
Mainly seperate coconut fiber and coconut peat.
2.Screen
The fiber blowing to screen and through screen forward to discharge port, it can collect pure fiber.
3.Baling machine
The coconut fiber can make bale and loading into container.
4.Coconut peat washing machine.
Reduce salt and EC inside.
5.Dewater machine.
Reduce moisture inside coconut peat around 50-60%
6.Coconut peat drying machine.
Using hot air dry coconut peat and get final product with moisture 12-15%.
7.Coconut peat block making machine.
Per block weight is customized, normally the block weight is 5kg,In order to facilitate transport.

Our service:
1) Assisting the clients preparing for the first construction scheme;
2) Installing and testing the equipment;
3) Training the first-line operators on site;
4) Examining the equipment regularly;
5) Taking the initiatives to eliminate the failure(s) rapidly at site;
6) Distributing the guarantee fittings door-to-door;
7) Providing technical exchanging;
8) Providing maintenance for big items.

FAQ:
1.How many days do you need to produce this machine?
This is specially designed machine according to your specific requirement. From engineer designing to production completion, It needs about 20-30 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very begining to the end of production. Every machine will be fully assembled and carefully tested before shipment.
3. What's your machine quality guarantee?
Quality guarantee time is one year, we choose world famous brand components to keep our machine in perfect working condition.
Details about your case: