Please click here to check who's online and chat with them.

Anlok Factory Directly Supply Hotel Lock System

Supplier From China
VERIFIED
Nov-06-13

own the handle once, if delay to pen the door, lock resets automatically after 6 seconds.
Low voltage warning: as the voltage is lower than 4.8v, warns appear when unlock the door with the sensitive card, but it still can open the door 100 times
Lock-fail warning: if the door is not locked (in the un-latched state), it will alarm after 3 seconds
Data query: it can store maximum 338 unlocking record, including unlocked record by mechanical keys
Door thickness: 38-80mm (please specify if the thickness is over 55mm), best thickness for installation is 45mm.


10pcs in a big carton


Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Anlok Factory Directly Supply Hotel Lock System

GOLD Member
Jul-15-17
Supplier From Huizhou, Guangdong, China
GOLD Member
VERIFIED
Mar-17-19
Supplier From Jamnagar, Gujarat, India
GOLD Member
VERIFIED
Dec-25-24
 
Pipe fittings are the general names of parts and components that play the role of connection, control, direction change, diversion, sealing and support in the pipeline system. Steel fittings are pressure fittings. According to the different processing technology, it is divided into four categories, namely, butt welding pipe fittings (divided into weld and no weld), socket welding and threaded pipe fittings, flange pipe fittings.

According to the application:
1. pipe fittings for connecting pipes are: flanges, live joints, pipe hoops, clamps, clamps, throat hoops, etc.
2. changing the direction of the pipe: bends, bends.
3. pipe fittings changing pipe diameter: variable diameter (different diameter pipe), different diameter elbow, branch pipe table, reinforcing pipe.
4. pipe fittings with additional piping branches: three links, four links.
5. pipe fittings for pipe sealing: gasket, raw material belt, thread, flange blind plate, pipe plug, blind plate, head, welding plug.
6. pipe fittings for pipe fixing: clasp, hook, ring, bracket, bracket, pipe clamp, etc.

According to the connection :1, welded pipe fittings 2, threaded pipe fittings 3, clamping pipe fittings 4, clamping pipe fittings 5, socket pipe fittings 6, rubber ring connection pipe fittings
According to the material divided into 1, cast steel pipe fittings 2, forged steel pipe fittings 3, alloy pipe fittings 4, stainless steel pipe fittings.
Pipe fittings are widely used in municipal, petrochemical, west-to-east gas transmission, ships and nuclear power.
GOLD Member
VERIFIED
Nov-29-21
Buyer From Dubai, United Arab Emirates
GOLD Member
VERIFIED
Nov-09-21
Supplier From Ha Noi, Cau Giay, Viet Nam
GOLD Member
VERIFIED
Jul-08-20

Grey Cement

$1 - $99
MOQ: 2000  
Sample Available
Supplier From Dubai, Dubai, United Arab Emirates
 
We offer GREY CEMENT (42.5) that is used in construction projects.

We can supply it in container or vessel shipment.
GOLD Member
Aug-31-20
Supplier From Surat, Gujarat, India
GOLD Member
VERIFIED
Jun-26-21

Cement

MOQ: Not Specified
Supplier From Faridabad, Haryana, India
 
We supply the Required Grade and Type of Cement that have been procured from the Top Brands made available to the customers at the required Specification for the best prices in the Bulk quantities required.
It is obvious that Cement is a very useful binding substance in construction. The usage of cement over diverse fields of construction has made it a very significant civil engineering material.

Cement mixed with water and fine aggregate produces mortar, sand and gravel to create concrete. It is the most-consumed resource and is widely available in the market.
GOLD Member
Sep-17-20
 
GOOD GRADE OCC WASTE PAPER SCRAP MADE IN USA GRADE 11 AND 12
Place of Origin : JAPAN, US, EUROPE
Materials : Waste Paper
Type : OCC, ONP, OMG, YELLOW PAGES, A3, A4 WASTE PAPER
Color : Mixed & NOT MIXED
Unit : Ton/Tons
Minimum Order : 20 Tons
Payment Term : T/T 50/50 and L/C 100% at sight
Shipping Lines : Ocean shipping
Estimate Lead Time : 15 - 20 days
Shipping Origin : Tokyo, Yokohama, Hamburg, New York, Long Beach
Supplying Capacity : 200 tons/month
Packaging : Bale (1.2-1.4 Tons/Bale), 20-25 Tons loading 40FT container

Verification Status