Demountable and portable warehouse structures ideal for logistics and industrial storage. These steel buildings offer flexibility for expanding or relocating your storage solutions with minimal downtime.
Application and design features:
buildings with built-in mezzanines
single span buildings
multi-span buildings
We will design a separate warehouse or a full-fledged logistics complex that fully meets your business requirements regarding:
layout, types and sizes of warehouses
warehouse capacity
load processing algorithms
permissible load and working mode of the equipment
number of docks
transport and people movement scheme
You will save yourself up to 45% of the cost of purchasing metal structures. The weight of the frame is reduced thanks to an "intelligent" design system based on metal structures, combining hot-rolled and hot-dip galvanized steel profiles - VMK (light metal structures) and VTPK (light steel thin-walled structures). We carry out construction works according to our own technical solutions.
With us, you will be able to start construction 2-3 months sooner, because the production of the frame starts already at the design stage. A full-service metal construction factory will work for you, which will manufacture and deliver the building in a complete set in the shortest possible time
Advantages of Eldorado GS
1.
Turnkey projects
Eldorado GS develops design and work documentation for the constructive solutions of the building, as well as delivers the quickly constructed buildings in complete sets. In addition, we can develop a complete building project, up to the layout and connection plan of equipment and engineering networks.
2.
Minimization of building expansion costs
A frame building is easy to build, rebuild and even move to another facility. 100% customizable to the set goal. We provide a comfortable environment for production processes, simplified internal logistics, adaptation of the building for transportation
3.
Efficiency of capital investment
It increases due to significant savings on metal structures, their delivery and installation. In addition, shorter delivery and construction times give you the opportunity to start business and generate revenue faster.
4.
Project optimization
Compared to the offers of other architectural offices, we reduce metal consumption for industrial buildings by up to 30%, and if the building is equipped with lifting mechanisms - up to 45%. We guarantee the safety and longevity of buildings
Steel structure warehouse is more durable and can be coated with aluminum compounds to prevent rusting. They are also cheaper and much quicker to construct since all of the drilling, cutting, and welding is done before the components are sent to the construction site to be assembled. One of the final benefits of pre-engineered steel buildings is that the overlapping panels offer better insulation to keep the building warmer in the winter and cooler in the summer.
Steel structure warehouse usually cost a little less than normal buildings. The construction process with pre-engineered steel buildings is usually not affected by delays like normal construction. Since the building just needs to be assembled, there are rarely any surprise cost increases. Also, these buildings can be assembled and erected by
5) easily installation , save manpower
The advantage of the prefab steel warehouse is that all the steel structure can fabricate in workshop and assemble on site , installation quickly , the small workshop can finished installation in 1 ¡§c 2 month , save man power , steel workshop use single colour sheet , eps sandwich panel and other single sheet with insulation , good effect of thermal insulation and separated chapter , prefab steel warehouse has a good seismic performance, light weight steel structure belongs to the flexible structure, which can effectively reduce the seismic response and disaster impact, highly conducive to the earthquake appropriate for demolition relocation.
The short construction period, can be put to use in advance, to obtain investment returns in advance;use the colourfull single sheet , nice look and improve the dynamic sense of the surrounding environment;because of the lightweight , the ground don¡¡¥t need the pile foundation , save the investment.
Steel structure building is a new type of building structure system, which is formed by the main steel framework linking up H section, Z section and U section steel components, roof and walls using a variety of panels,and other components such as windows, doors, cranes, etc. Steel structure building is widely used in warehouses, workshops, large factories, etc.we also can provide Multi-storey steel structure building consists of beams and columns from welded H-shaped steel, hot-rolled H-shaped steel. In this frames, the beam and column system takes the gravity load such as dead and live loads.Commercial building such as offices, shopping mall, apartments can be built to multi-storey or just single storey. With the stable steel structure frame fast construction and easy installation, long using life up to 50 years, earthquake resistance, etc. As the turn-key construction company, Toohot Group will supply decoration materials such as glass wall, ceiling system, floor tiles and so on according to the clients requirements.
Our company supply Prefabricated Steel Structure, Light Steel Structure Warehouse China,Prefabricated Light Steel Structure Warehouse, which can be used in many places. Our products have high quality and competitive prices. If you need, welcome to contact us to know more.
High Rise Prefabricated Plans Light Steel Structure Warehouse Hotel Building
1. Different types and sizes according to customer's needs, large or small, wide span: single span or multiple spans, the max span is 36m without middle column.
2. Low cost and maintenance: unit price range from USD30/m2 to USD70/m2 according to customers request.
3.Fast construction and easy installation: time saving and labor saving, all the items are factory- made,pre-cut,pre-welded, pre-drilled,pre-painted.
4.Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.
Steel structure is a new advanced structure developed from space frame. All parts making up a pipe truss structure are steel pipe bars. The pipe bars are connected by the method of welding, having been cut by intersection line cutting machine in advance.The steel pipe truss structure is widely used in the area of large span public buildings, such as exhibition halls, terminal buildings, stadium, theaters, etc.
2. Advantage of large span pipe truss structure for sports center:
1) Light in weight, especially when applied as large span structures.
2) Excellent stability and aseismic performance, as the structure bears the load and spreads it to average directions.
3) Long service life up to 50 years.
As a Fabrication Metal Light Steel Structure Workshop, Fabrication Metal Light Steel Structure Workshop, Custom Steel Space Truss Structure, custom steel structure office building manufacturer, we guarantee quality and delivery time. Our company is a leader in the industry and we will not disappoint you!
100sqm-10000sqm Steel Structure Hangar/Warehouse
Jiujiang City Modern Steel Structure truss has features of high fire resistance, strong corrosion resistance.
Specifications:
1) Main Steel: Q345, Q235, Q345B, Q235B etc.
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: EPS, Rockwool, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT and more
Drawings & Quotation of Steel Structure Warehouse custom:
1) Customized design is welcomed.
2) In order to give you an exactly quotation and drawings, please let us know length, width, eave height and local weather. We will quote for you promptly.
The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
We are a with national steel structure engineering contractor qualification, steel structure manufacturing level of qualification and architectural engineering design B qualification, set light steel and heavy steel structure engineering, Pre Fabricated Steel Building Structures, design, production, construction and installation as one of the central China strength steel construction enterprises