Please click here to check who's online and chat with them.

Transformer Load Box

Supplier From China
Jul-21-21

product features Product Characteristics
1 in light weight
2 good-looking appearance
3 capaciousness
4 strong stability

Product Parameter Product Parameters
FY96-H Current Transformer Load Box
environmental conditions temperature 15 25
humidity

Price and Minimum Quantity

Price: $770 - $15397
MOQ: Not Specified

Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Transformer Load Box

Jun-25-21

Transformer Load Box

$770 - $15.40K
MOQ: Not Specified
 
FYSeries current and voltage Transformer Load Box is specially provided for various payloads when testing current and voltage transformers and it is an ideal matching product for various transformer verification devices.The Transformer Load Box is in strict accordance with the national standard jjg313-94 JJG314-94 design for.Its Transformer Load Box output capacity is large Full range of loads in light weight good-looking appearance Stability and other advantages.

Product nickname Transformer Load Box Voltage Transformer Load Box Current Transformer Load Box Voltage load box Current load box Voltage load box Current load box
Jun-19-21

Transformer Load Box

$770 - $15.40K
MOQ: Not Specified
 
Product brief introduction Product Introduction
FYSeries current and voltage Transformer Load Box is specially provided for various payloads when testing current and voltage transformers and it is an ideal matching product for various transformer verification devices.The Transformer Load Box is in strict accordance with the national standard jjg313-94 JJG314-94 design for.Its Transformer Load Box output capacity is large Full range of loads in light weight-looking appearance Stability and other advantages.
Aug-27-21

Transformer Load Box

$770 - $15.40K
MOQ: Not Specified
 
Product description:

Transformer load box is also called current transformer load box, voltage transformer load box, PT load box and CT load box. Current, voltage transformer load box and transformer load box. When testing current and voltage transformers, PT/CT mutual inductance The load box provides a variety of effective loads and is an ideal accessory product for various transformer verification devices.



Major Technical Index

1. Environmental conditions

Temperature 5 40 Humidity:
Jul-01-21

Transformer On-Load

$770 - $15.40K
MOQ: Not Specified
 
The on-load tap changer is the only moving part connected with the transformer circuit so more and more attention has been paid to the detection of the on-load tap changer.In the electrical equipment handover and preventive test regulations it is required to check the action sequence of on-load tap changer measure switching time etc.This device is mainly used for measuring the transition waveform transition time transient resistance of transformer on-load tap changer three-phase synchronism etc.
May-29-21

Transformer Capacity Load No-Load

$770 - $15.40K
MOQ: Not Specified
 
Product Introduction
This product is specially used for measuring the capacity of distribution power transformer measuring the no-load and short-circuit loss of transformer and has the function of harmonic analysis which is convenient for analyzing the quality of on-site power network. The device can automatically check whether the wiring is correct and display the vector diagram of the three-phase current and voltage when testing the three-phase transformer. At the same time necessary correction (such as waveform correction temperature correction unrated voltage correction calibration unrated current correction) is introduced to make the test results more accurate.

Product name Transformer capacity test instrument transformer capacity load tester
May-11-18
 
GDKF Transformer Load and No Load Tester

Introduction:

It's used to Measure the transformer load and no load current, load and no load loss, short-circuit voltage, short circuit (load) losses and capacity.

Test items:

RMS phase voltage
Average value of three-phase AC voltage
Three-phase current RMS
Percentage of no-load loss and no-load current
Load loss, impedance voltage, and the percentage of short-circuit impedance
Any given temperature, load loss, the percentage impedance voltage and short circuit impedance
Voltage waveform in the percentage of each harmonic component
Current waveform in the percentage of each harmonic component

Technical index:
Current measurement range: 100mA ~ 5A, accuracy class 0.2;
Voltage Range: 10V ~ 650V, accuracy class 0.2;
External transformer can broaden the scope of measurement instruments;
Frequency Range: 40 ~ 65Hz, accuracy class 0.2;
Power Input: AC220V ± 10%

Company Information

Our company has become one of the leading manufacturer of petroleum testing instrument and electrical testing instrument since 2009sâ??.
We have developed sales channels in many countries such as Malaysia,India,Germany,USA,Mexico,Saudi Arabia,South Africa and other countries worldwide. and we have gained great advantage and high reputation in international market.
We are making effort to develop together with customers from both domestic and abroad on the basis of reciprocity.Client,quality and service are our supreme target.

Our Services

Pre-sale Service:
Inquiry will be replied within 24 hours.
Welcome to visit our factory.
Technical datas and operation manual sent for evaluation.
After-sale Service:
Training how to instal the machine, training how to use the machine at our factory;
Engineers available to service machinery overseas at customers' cost;GDKF Transformer Load And No Load Capacity Characteristic Tester
May-27-21

Transformer On-Load Tap-Changer

$770 - $15.40K
MOQ: Not Specified
 
The on-load tap changer is the only moving part connected with the transformer circuit so more and more attention has been paid to the detection of the on-load tap changer.In the electrical equipment handover and preventive test regulations it is required to check the action sequence of on-load tap changer measure switching time etc.This device is mainly used for measuring the transition waveform transition time transient resistance of transformer on-load tap changer three-phase synchronism etc.
GOLD Member
VERIFIED
Jan-27-24
Supplier From Ahmedabad, Gujarat, India
May-15-21
 
The on-load tap changer is the only moving part connected with the transformer circuit so more and more attention has been paid to the detection of the on-load tap changer.In the electrical equipment handover and preventive test regulations it is required to check the action sequence of on-load tap changer measure switching time etc.This device is mainly used for measuring the transition waveform transition time transient resistance of transformer on-load tap changer three-phase synchronism etc.

product names On - load tap - changer tester transformer on - load tap - changer tester transformer on - load switch tester

Verification Status