Please click here to check who's online and chat with them.

Cold Drawn Precision Tube For Gas Spring

Supplier From China
Sep-30-22

Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages
Short delivery time Quality assurance Competitive price

Price and Minimum Quantity

Price: $1405
MOQ: 1 Metric Tonnes
Production Capacity: 10000
Packaging: Standard Exporting Seaworthy Packing
Sample: Available. Sample Cost Born By Supplier

Product Model And Origin

Brand: HENSON

Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Cold Drawn Precision Tube For Gas Spring

GOLD Member
Sep-30-22

Cold Rolled Precision Steel Tubes For Gas Spring

$1.65K
MOQ: 1  Tons (UK)
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages Short delivery time Quality assurance Competitive price
GOLD Member
Apr-13-22

Gas Spring Cold Drawn Seamless Steel Pipe

$1.82K
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-14-23

Gas Spring Cylinder Tube

$1.35K
MOQ: 1  Tons (UK)
Sample Available
Supplier From Taian, Shandong, China
 
Innovative technology of pre-materials suitable for gas springs
welded and drawn according to ASTM A213
various ID tolerance requirement of H8, H9, H10 and H11
surface roughness below 15RA (0.40 �¼m)
mechanical properties are controlled to endure excessive stress
hardness, tensile strength, yield strength and elongation
servicing high precision pneumatic cylinder applications

ODï¼?mm) ID(mm) WT(mm) ID Tolerances,+0/-0.05) Specifications Materials Surface Finish(max)
15.0 13.0 1.0 CGS-031,H9 A213
SAE1010/#10;

SEA1020/#20

;Q235;

304L;316L

ID < 20 RA <0.4um
18.0 16.0 1.0 A269 OD < 32 RA <0.8um
19.0 17.0 1.0
19.0 16.0 1.5 CGS-021,H10 A213 ID < 20 RA <0.4um
22.0 19.0 1.5 A269 OD < 32 RA <0.8um
27.0 24.0 1.5
28.0 24.0 2.0 CGS-011,H11 ID < 20 RA <0.4um
30.0 25.0 2.5 A213 OD < 32 RA <0.8um
32.0 29.0 1.5 A269
32.0 28.0 2.0
40.0 36.0 2.0
40.0 35.0 2.5
44.0 40.0 2.0
50.0 45.0 2.5
GOLD Member
Sep-30-22

Gas Spring Tubes Od15.0Mm

$1.29K
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages
Short delivery time Quality assurance Competitive price
GOLD Member
Dec-15-21

Precision Steel Pipe Tube For Gas Spring

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

A192 Gas And Water Precision Seamless Tube

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Sep-30-22

Sae1010 Gas Spring Tubes Od18.5Mm

$1.35K
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
Product Name Precision Steel Pipe
Standard DIN2391 EN10305-1 ASTMA179 ASTM A192 ASTM A519
Material SAE1010,SAE1020,#10,#20,#45,304,316
Outer diameter 8MM-50MM
Wall thickness 0.5-50.0MM
Length fixed(3-12m) or customized
Technology High precision Cold drawn/ Cold rolled
Heat treatment BK/BKS/NBK
Advantages
Short delivery time Quality assurance Competitive price
GOLD Member
Dec-15-21

Precision Steel Tube Used In Cylinder

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

Precision Seamless Steel Pipes For Gas Spring

$1.82K
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder

Verification Status