PP hollow construction template extrusion line requirement:
1).material: PP origin material or recycling material
2).PP construction template specification:
915mm(W)*1830mm(L)*14-16mm,1220*2440*15-18mm
3).installation power: 200KW
4). actual consumption power:120KW
5). extrusion capacity:200-400kg/h
6). production capacity:300-500pcs/Day
7). PP construction template production line dimension: 30(L)*6(W)*3(H)m
PP hollow construction template machine list of template as below:
1) PP hollow construction formwork extruder
2)PP hollow construction formwork mold
3)PP hollow construction formwork forming table
4)PP hollow construction formwork cooling support
5)PP hollow construction formwork haul off machine(first)
6)PP hollow construction formwork haul off machine(second)
7)PP hollow construction formwork cutting machine
8)PP hollow construction formwork conveying machine
PP hollow construction formwork is mainly used in Civil concrete building
PP hollow construction formwork machine design depends on the specification is :915*1830mm,1220*2440mm
PP building formwork is a kind of energy-saving green environmental protection product. It realizes replacing wood with plastic and replacing steel with plastic. It has been widely used in construction and bridge engineering.
PP hollow construction formwork can used almost 50times
PP hollow construction formwork can be recycled
PP hollow construction formwork can produce by recycled material
Online consulting:WhatsApp:+86 13515329658
concrete formwork slab shoring system for construction
We are supplier of shoring formwork for concrete construction.
Our company do scaffolding and formwork shoring business more than 20 years,we exported to almost all of the world.
We have a patent products: Panel-Prop Early Stripping System.The technology is from Canada,we got invention patent in USA,Australia,and registered brand in USA,Canada and European Union.
It includes only panel and prop, Erection and removal are very simple.Average erection or dismantling production speed per man-day is 100M2.We have confidence that it's the most advanced and fastest Early Stripping Shoring System in all of the world.
Wall formwork, column formwork, concrete formwork, construction formwork, shuttering, single-sided formwork
High flexibility with only a few main components can meet any construction requirements. Timber beam h20, steel waling, plywood and clamp etc.. These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens.
Advantages: