Please click here to check who's online and chat with them.

Sending Inquiry For: Boiler Machinery

Aug-10-15
 
1) The 4~ 6t/h boiler uses quick fitting structure, very easy for installation and save boiler room space;
2) The boiler of 6 ~ 25t/h is composed of 2 main parts: the upper body which is for heat exchange, and
    lower body  for fuel combustion
3) All boiler parts are assembled according to the international standards as customers required, 
     Including GB, ASME, EN, IBR and so on. Safety is the most concerned issue for our customers .
4) Quick installation    
    we provide supervision service to customers for installation and commissioning work so the new boiler
    can operate quickly after delivery.
5) Economic for long term operation
     With reasonable design to the boiler structure and equipped with quality auxiliary machines, our
     boiler saves a lot in fuel consumption and can reach the highest efficiency as designed for long term
    operation. 
6) Low cost on maintenance
    As we use international standard material for assembling boiler parts and with high quality auxiliary 


1. Way of delivery: by Sea or Railway or truck based on needs
2. Shipping model: by normal container and flat rack or bulk cargo based on goods, we can suggest the container
3. Customers specifying freight forwarders or we send bottom shipping price from our forwarder partner for your reference, negotiable shipping methods
4. Packing: nude for boiler main part in nude, accessories in export-use wooden box
5. Payment Terms: T/T, LC; 30% deposits; 70% balance before delivery.
Please ask detailed and specific questions about Pricing, Minimum Order Quantity, Delivery Timelines etc. Detailed Messages result in prompt responses.

Renew