1. Product details Ded to apply to tile adhesive, skim coat indoor or outdoor, troweling compounds, gypsum based mortars, it can be also und bags with pe liner. 8. Delivery Delivery time: within 15~20days after payment confirmed. 9. Storage: 3s-6001yh must be stored in a cool and dry place. To prevent moisture penetration, the storage temperature is not over 30 degree. It should not be subjected to pressure of high temperatures during storage because of the risk of caking. Packaging which has been opened should be sealed again as soon as possible. Not exposure to water, sunlight, especially during transportation. 3s-6001yh storage time should not exceed 6 months from the date of delivery. Packing: 20/25kgs /bag. Paper compound bags with pe liner.